Manufacturing work steps and activities are defined depends upon on the scope of pressure vessel components, type of materials and inspection. The following is a sample work activities for a Carbon Steel material cylindrical or spherical separator pressure vessel manufacturing. This will help you develop a preliminary schedule. The full scope of work, inspection test plan and method of statement shall be studied with the consultation of your team in order to get a final schedule which is realistic and meaningful.